| category: | Completed Condo |
| address: | 11 St Joseph St |
| postal code: | M4Y 3G4 |
| floor: | 18 |
| unit: | 206 |
| size: | 433 to 1,279 |
| builder: | Barney River Investments |
|
blog
| forum
| post condo listings FREE
|
|
|
|
about this condo
condo information
condo amenities
Fitness Centre, Party Room with Billiards, Rooftop Terrace with BBQs, Teaching/Catering Kitchen, Theatre Room.
condo description
Located in the prime Bay Bloor Corridor just steps from Yorkville, this former rental apartment building will be converted into a new collection of condos. The neighbourhood boasts luxury shopping, first class restaurants and subway access, and is within walking distance of the ROM, Royal Conservatory of Music, University of Toronto and Queen\'s Park.
Suites, ranging from studio units to 2+den layouts and townhomes, will be ready to move into within 90 days of purchase.
Suite Features
Engineered hardwood flooring, European-style kitchen cabinetry, quartz kitchen countertops, large-format porcelain tile flooring in the bathrooms In the News: |
|
what others are saying
in the news
Handpicked by Livehigh
(Sunday, April 11, 2010)
Handpicked by Livehigh
(Tuesday, April 6, 2010)
latest comments
LiveHigh Team (March 24, 2010)
Exclusive VIP Broker Event on March 22, 2010 at 7 PM.
Update on pricing: > Studios from $219,900 > 1 BR from $265,900 > 1 + Den from $374,900 > 2 BR from $424,900 > 2 + Den from $531,900 > Townhomes from $434,900 > Floorplans are available online (see website in description)
LiveHigh Team (March 22, 2010)
|
all condos completed condos new condo projects condos coming soon
Watch all Listings for this Condo
![]() $1.00/month 2 Bedrooms Add to My Watchlist | ![]() $1.00/month 1 Bedroom Add to My Watchlist |
Some notable updates:
> Pricing started at $244,900 for a Bachelor unit, 487 sf ($503/sf)
> 1 BR units started at $303,900 for 591 sf ($514/sf)
> 1 + Den units started at $377,900 for 724 sf ($522/sf)
> 2 BR units started at $474,900 for 933 sf ($509/sf)
> Parking was available for purchase for an additional $30,000
> Locker was available for purchase for an additional $3,500
> Maintenance fees estimated at $0.45/sf per month including hydro
> Occupancy as early as 90 days
> As the building is already built, there were quite a number of completed (model) suites available for viewing. The suites were refinished with engineered hardwood flooring, stone kitchen countertops, stainless steel appliances, new bathroom vanities and new lighting.